Page 4 of 4 FirstFirst ... 234
Results 46 to 47 of 47

Thread: TRQ Build

  1. #46
    Join Date
    Jun 2012
    Posts
    5,320
    Thanks
    43
    Thanked 857 Times in 625 Posts
    Quote Originally Posted by UpsetChemist View Post
    The TRQ was missing the element of an HD U-Bolt.
    With my welding jig complete I can now be assured that the mount will fit absolutely perfect with zero warping.

    WOZZER...that jig is one HUGE hunk-o-aluminum. Very impressive.
    CP......
    HOW we ride today, may determine IF we can ride tomorrow

  2. #47
    Join Date
    Dec 2013
    Location
    Tempe AZ
    Posts
    1,147
    Thanks
    78
    Thanked 226 Times in 172 Posts
    That it is. I needed something that was in excess of 2.5" high and wide enough to weld multiples bolts simutanulous. They will need to cool for about 20 minutes before I can pull them from the jig afterwards. The aluminum helps pull the heat out of the part.

    Just ran a fly bar over the top to make it flat, then set my dials to zero and went to town.

  3. The Following User Says Thank You to UpsetChemist For This Useful Post:

    Themadpedder (01-13-2015)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •